| Property | Parameter | Description |
|---|---|---|
| Product Name | Galvanized Steel Tube | Hot-dip or pre-galvanized carbon steel tube |
| Base Material | Q235B / ASTM A53 / SS400 | Low-carbon steel substrate |
| Standard Compliance | ASTM A53, BS 1387, EN 10255, GB/T 3091 | Meets major international standards |
| Galvanizing Method | Hot-Dip Galvanized / Pre-Galvanized | Zinc coating process options |
| Zinc Coating Thickness | 60 - 550 g/m² | Per ASTM A123 / ISO 1461 |
| Carbon (C) | ≤0.25% | Carbon content for formability |
| Manganese (Mn) | ≤1.20% | Improves strength and toughness |
| Phosphorus (P) | ≤0.035% | Controlled for ductility |
| Sulfur (S) | ≤0.035% | Low sulfur for weldability |
| Tensile Strength | ≥330 MPa | Minimum tensile strength per ASTM A53 |
| Yield Strength | ≥205 MPa | Minimum yield strength |
| Elongation | ≥23% | Ductility in 50mm gauge length |
| OD Range | 21.3mm - 219.1mm (1/2'' - 8'') | Available outer diameter options |
| Wall Thickness | 1.0mm - 10.0mm | Standard and custom thickness |
| Length | 5.8m, 6m, 12m or custom | Standard and custom lengths |
| Surface Finish | Bright silver, smooth zinc coating | Uniform galvanized surface |
| Application | Construction, fencing, water supply, scaffolding | Typical application industries |
| Certification | EN 10204 3.1, ISO 9001, SGS | Quality certifications provided |
| Packaging | Bundled with steel strips, plastic caps on ends | Standard export packaging |
| MOQ | 5 tons | Minimum order quantity |
Placed a mixed-container order totaling 14 tons across three sizes—60.3mm, 88.9mm, and 114.3mm OD, all in 4.0mm wall—for low-pressure fluid transmission conduit at an oil sands facility in Alberta. All material certified to ASTM A53 Grade B with hydrostatic test documentation at 2.5 MPa. Grooved end finish on the 114.3mm tubes was dimensionally accurate and compatible with our Victaulic couplings—no rework required on site. Bureau Veritas inspection was coordinated by the supplier before shipment. Total lead time from order confirmation to delivery in Edmonton was 38 days including ocean freight, which aligned with our project schedule. Pricing was 11% below our previous North American distributor for the same spec.


