| Property | Parameter | Description |
|---|---|---|
| Product Name | Prefabricated Enclosure Structural Steel | Factory-fabricated steel components for modular enclosure structures |
| Material Grade | Q235B / Q355B / S275JR | Low-alloy high-strength structural steel grades commonly used |
| Size Range | Wall thickness: 2–20 mm; Section height: 50–500 mm | Custom dimensions available per project drawings |
| Yield Strength | ≥235–355 MPa | Minimum yield strength depending on grade selected |
| Tensile Strength | 370–630 MPa | Ultimate tensile strength range across standard grades |
| Elongation Rate | ≥20–22% | Minimum elongation at fracture ensuring ductility |
| Carbon Content | ≤0.20% | Weight percentage of carbon in steel composition |
| Sulfur Content | ≤0.035% | Maximum sulfur content to ensure weldability |
| Phosphorus Content | ≤0.035% | Maximum phosphorus content controlling brittleness |
| Surface Treatment | Hot-dip galvanized 60–85 μm / Epoxy primer 50 μm | Anti-corrosion coating applied before delivery |
| Fabrication Tolerance | ±1.5 mm (length); ±0.5 mm (cross-section) | Dimensional accuracy per prefabrication standard |
| Welding Standard | AWS D1.1 / GB 50661 | Structural welding code applied during fabrication |
| Packaging | Steel bundled with strapping tape; wooden pallet base | Bundle weight ≤3,000 kg per unit for safe handling |
| Storage Conditions | Dry warehouse; humidity ≤70%; temperature −20°C to 50°C | Avoid direct contact with ground; stack height ≤2 m |
| Application | Security fencing, industrial enclosures, modular compound walls | Suitable for power plants, substations, logistics parks |
| Certification | ISO 9001:2015; CE Marking; GB/T 700 | Quality management and product compliance certifications |
| MOQ | 5,000 kg | Minimum order quantity per single specification |
| Supply Capacity | 500,000 kg/month | Maximum monthly production and delivery capacity |
Ordered 24 A572 Gr.50 enclosure frames for an industrial shelter project in Ohio, targeting a 21-day lead time. Actual delivery came at 29 days due to a production scheduling issue — this caused us a minor site delay. When I raised it, the team acknowledged the error, provided updated tracking daily, and issued a partial freight credit. The frames themselves met all specs: M24 bolt patterns aligned, weld quality passed our AWS D1.1 inspection, and the 80-micron primer coat was uniform. If the logistics match the material quality, this supplier is a strong long-term option.


